First 3 orders out the door before 9 AM. Florida’s early risers win.
Beat the Heat, Beat the Humidity – Early Starts Lead to Better Installs and Faster Results
At Chromology Florida East Inc. we know one simple truth about working in South Florida: mornings can make or break an epoxy job. Heat and humidity don’t wait for anyone. By mid-morning, conditions shift fast – and if you miss that early window, you’re already fighting the environment instead of working with it.
That’s why the contractors who show up early consistently get better results, smoother installs, and faster turnarounds. And it’s exactly why the first three orders of the morning go out fast.
Why Early Orders Matter
Florida’s climate rewards early action. In the morning hours, humidity levels are typically lower – often hovering around 75% before temperatures climb. Those conditions are ideal for epoxy, polyaspartic, and resinous systems.
Pouring early helps reduce:
- Amine blush and surface contamination
- Cloudy or hazy finishes
- Slow or uneven curing
- Moisture-related adhesion issues
Contractors who arrive before 9 AM gain a real advantage on and off the jobsite.